Redline Permit
For building departments

Plan check with fewer correction rounds.

Redline Permit is an online plan check portal built around your city's own codes. It gives every residential set a first read, circles each likely correction on the sheet it belongs to, and hands your plan checker a marked-up set instead of a blank one.

Your reviewers approve, edit or reject every comment. Nothing reaches the applicant without staff approval.

BEDROOM 2BATHLIVINGSTAIR 1 2 3 1 · EGRESS SILL OVER 44 IN · CRC R310 · A2.0 2 · SAFETY GLAZING AT TUB · CRC R308.4 · A2.0 3 · DIMENSION RISERS AND TREADS · CRC R311.7
SHEET R-1

The first review now has to be the complete one.

California has put numbers on residential plan check. A city has a limited number of reviews and a clock on each, and applicants have new remedies when the clock runs out.

2
plan check reviews a city may require for a building permit, after which it may deny a noncompliant application.
AB 1621 · signed Sept 29, 2026
30
business days of review, after which an applicant for 1 to 10 units may hire a qualified private plan reviewer.
AB 253 (2025) · H&S 17960.3
15
business days to decide completeness, judged only against the city's posted checklist; then 30 or 60 business days to decide.
AB 2234 · Gov. Code 65913.3
60
days to act on a complete ADU application.
Gov. Code 66317

Summaries for orientation, not legal advice. Confirm current text at leginfo.legislature.ca.gov and with your city attorney, including AB 1621's effective date.

SHEET R-2

One portal from submittal to permit pickup.

Most correction letters repeat the same items: missing standard notes, unsigned sheets, energy and CALGreen measures, egress and separation details. Redline catches that layer before your plan checker opens the set, so staff time goes to the questions that need judgment.

The live Redline portal showing the seven steps from Submit to Permit pickup
From the live portal: every application shows where it stands and who has the next move.
1 · OWNER / DESIGNERSubmitOne short form; the PDF comes from Google Drive or Dropbox.
2 · REDLINE + CITYCity reviewFirst read in about a minute; reviewers decide each draft.
3 · OWNER / DESIGNERCorrectionsOne list, each comment with its clip and code note.
4 · REDLINE + CITYResubmit and recheckOnly open items; unrequested changes listed.
5 · CITYAgency approvalApproved once every comment is cleared.
6 · SCHOOL, SANITATION, WATEROther agenciesEach clearance tracked on the same file.
7 · OWNER / CONTRACTORPermit pickupPickup notice. The City collects its own fees.
SHEET R-3

Anatomy of one correction.

Every draft carries what a reviewer needs to decide in seconds: the spot on the sheet, the code section, the department and a priority.

1CRC R310BUILDING · SHEET A2.0CRITICALAI DRAFT
BEDROOM 2WIN W3 · SILL 48" AFF

Bedroom 2 window W3 is shown with a 48 in sill. An emergency escape and rescue opening may have a sill no higher than 44 in above the floor. Revise W3, or add a compliant opening, and note it on A2.0.

ApproveEditReject

Illustration of the comment format.

  • AThe number matches the red cloud on the sheet.
  • BCode section, linked to the official text.
  • CDepartment and sheet, for routing and the letter.
  • DPriority: Critical, Major or Minor. Critical sorts first.
  • ESource: AI draft, standard note or reviewer.
  • FThe clip: the exact spot on the sheet.
  • GThe reviewer's decision. Nothing goes out without it.

The first read, in four layers

L1
Completeness
The set is checked against your city's submittal list for that permit type before any code review.
L2
Standard notes
Text search on every sheet the moment the set arrives, with no AI involved. A missing note becomes a draft the reviewer approves in one click.
L3
Code review drafts
Likely issues against your codes and amendments, each clipped, numbered on the drawing, cited and prioritized.
L4
Judgment items
Design review, neighborhood compatibility, protected trees. Flagged for a planner, never decided.

Standard notes in the Monrovia example include:

  • All sheets signed by the design professional
  • Attic access 22 in by 30 in, location shown
  • Safety glazing at hazardous locations
  • Smoke and CO alarms, hard-wired, interconnected
  • Roof covering ICC-ES report and cool-roof ID
  • EV-ready raceway and 40 A circuit
  • Electric-ready notes: water heater, cooktop, dryer
  • GFCI and AFCI protection as required
  • Surge-protective device at the service
  • Pressure-balance valves at showers and tubs
  • Dryer duct, 4 in metal, 14 ft max
  • Hot water pipe insulation

The correction letter prints by department, critical items first, each with its clip, and closes with: "Every comment was reviewed and approved by City staff."

SHEET R-4

Rechecks that stay focused.

Anything still open goes back with the same numbers, so cycle 2 reads like a short checklist, not a new letter.

CYCLE 1Letter sentApproved comments only, grouped by department.
RESPONSEAnswers plus one revised setIn the portal, or the designer's own response letter (PDF or Excel).
CYCLE 2Recheck open itemsRevised set compared with the last; changes nobody asked for are listed.
APPROVEPlan check clearedEvery comment cleared, every unrequested change accepted.

For reviewers and supervisors

My filesEach reviewer sees the files assigned to them, filtered by department.
Sheet indexSheets sorted by discipline: G, A, S, M, E, P, T, C, L, F.
Readiness scoreCompleteness and standard notes on arrival, shown on every task.
Internal notesNotes between reviewers that the applicant never sees.
Stats stripFiles with the City, average days waiting, share of AI drafts kept, most-cited sections.
Bring in old filesImport permits already in review and earlier correction letters.
NEW IN THE PORTAL · NOV 2026

The first read shows its work.

Every first read now lists each step it took, so a reviewer can see what was checked before trusting a single draft. Two new buttons put the same engine on one detail at a time.

✓Read the set14 sheets✓Sort sheetsG · A · S · T✓Completeness11 of 12✓Standard notes19 of 24 found✓Search rule pack30 rules✓Draft comments18, 3 critical✓Clip and cite18 clips…Waiting on reviewersevery draft needs a yes
Check a detailDrop in a photo, screenshot or one PDF page of a single detail. Redline reviews just that detail against your rule pack and returns cited draft comments, each with its own clip.
Photo of my markupStill red-pen on paper? Photograph the marked sheet. Each hand mark becomes a numbered draft comment in your words, ready for the correction letter. Nothing unmarked is added.
Visible step listSheets read, disciplines sorted, completeness, standard notes, rules searched, comments drafted and clipped. Then it stops and waits for your staff.
SHEET R-5

Set up around your city, not a template.

Every city's procedure is different. Each portal starts from a jurisdiction profile built from your own code and handouts, and we do the setup.

  1. Confirm jurisdiction by APN and boundary map.
  2. Map your departments: Building, Planning, Fire, Police security, Public Works and outside agencies.
  3. Load the 2025 California codes (effective Jan 1, 2026), your local amendments and zoning standards.
  4. Build the rule pack: section, what to look for, severity, source, and "verified" or "needs verification."
  5. Your submittal checklists drive the completeness check. Profiles are re-verified every six months.
The live portal: picking a lot fills in the APN, zone, lot size and existing building
Live portal: tap the lot and the APN, zone, lot size and existing building fill in. Planning confirms the zone at intake.
Department map from the Monrovia example
DepartmentWhat it checksWhere the rules live
Building and SafetyCRC/CBC, electrical, mechanical, plumbing, Title 24 energy, CALGreenMMC Ch. 15.04 Codes Adopted
PlanningZoning, setbacks, height, FAR, parking, ADU, SB 9, compatibility, historicMMC Title 17
FireFire code, sprinklers, access, hydrants, fire hazard zone constructionMMC Ch. 15.20
Police (security)Doors, locks, lighting, glazing near locksMMC Ch. 15.08
Public WorksGrading, erosion control, drainage and LID, undergrounding, drivewaysMMC 15.28, 15.36, Title 12
SHEET R-6

Records, access and who decides.

The AI drafts and keeps the books. Your staff keep every decision, and your records stay where they belong.

Drawings stay putPlans stay in the applicant's Google Drive or Dropbox. Redline keeps the link, the comments and small clips.
City accounts onlyReviewer accounts need your City email domain. Admin access is by invitation.
Fees stay with the CityThe City collects its own fees. Redline only sends reminders.
No citation, no commentEvery AI comment must cite a code section and a sheet. The AI never approves or denies anything.
SHEET R-7

Tested in the open.

We ran blind first reads on three real residential sets and scored them against the agencies' written correction lists: 75 comments from a contract plan checker for Monrovia and from LA County Building and Safety.

CaughtPartly caughtMissed

Most misses were standard notes. The standard-notes checklist was added in response; on the first set it now flags 6 of the 15 misses before any AI runs. A first read is a head start, not a replacement for a plan checker, which is why every draft waits for one.

SHEET R-8

Start small, on new projects.

STEP 1We set up your portal around your process and code.
STEP 2First month free on new residential projects.
STEP 3Agree on cost, then bring in projects already in review.

Questions building officials ask

Does the AI approve or deny anything?

No. It drafts comments and keeps the bookkeeping. Reviewers approve, edit or reject every comment, add their own, and approve plan check.

Where do the drawings live?

In the applicant's own Google Drive or Dropbox. Redline keeps the link, the comments and small clips of the sheets.

Does anything change in how we collect fees?

No. The City collects its own fees, online or at the counter. Redline only sends fee reminders to applicants and staff.

What about our local amendments?

They are part of your city's profile. Each rule carries its source and is marked verified or needing verification, and profiles are re-verified every six months.

We already use a contract plan checker.

Redline hands them a marked-up set to start from, which can cut outside review rounds. The final decisions stay with whoever reviews for your city.

What does it cost?

The first month is free on new residential projects. After that we work out setup and ongoing cost together, based on what your team needs.

See it on one of your own plan sets.

A 20-minute walkthrough with your team, on Zoom or at City Hall. Redline Permit was built by Yifu Pan, a California architect who submits plans to cities across the San Gabriel Valley and Los Angeles County.

Yifu Pan, Founder ypan@redlinepermit.com 818-445-1984 304 S Broadway, Los Angeles, CA 90013